PV developers & operators
Increase the efficiency and profitability of your solar park with battery storage
For PV developers and operators
Increase the profitability of your PV park: A battery storage system can help you balance price fluctuations in the electricity market, use your grid connection more efficiently, and unlock new revenue streams – from day-ahead and intraday trading to grid services.
Through synergies in construction and operation, investment and operating costs can be reduced.
Your benefits at a glance

More Profit, Less Risk
Our customized battery storage systems perfectly complement your PV projects and ensure long-term profits.
Turnkey Solution
We take care of project development, financing and implementation. You provide the grid connection; we'll take care of the rest.
Flexibility that fits your Needs
Whether you're looking for a full-service solution or targeted support, we adapt to your needs to ensure your project's success.
Stronger Impact on the Energy Transition
Battery storage systems stabilize the power grid, minimize the need for redispatch measures, and improve local energy security.
Martin Körner
CEO & Co-Founder
martin.koerner@luxera-energy.com
None! Battery storage and PV systems complement each other perfectly. In rare cases when both feed into the grid simultaneously, the PV system takes priority. Your existing feed-in profile will remain unchanged.
No, in co-location projects, the battery storage system and the PV park share the same grid connection. This reduces effort, permitting requirements, and costs.
Our systems are designed for projects ranging from 8-500 MWp and can be tailored to your generation profile.
Yes, the battery storage system operates independently, it does not affect existing subsidies or PPAs.
These systems can be used flexibly in the electricity market. They can be used for day-ahead and intraday trading, as well as for grid services, such as primary and secondary balancing power. We are happy to advise you on the model that best suits your project.
The effort required from you is minimal. You provide us with your project data, and we take care of the rest, including grid connection, permits, coordination, and commissioning.
We cover the costs during the permitting process. When it comes to construction, we’re happy to discuss a potential co-investment.
Yes, that’s possible. Our modular, AC-coupled storage systems are suitable for retrofitting into existing installations.
Generally, we use a 1:1 ratio between storage capacity and grid connection capacity. Nevertheless, we analyze each project individually and develop a customized concept tailored to your specific needs.
Ideally, it would be located right next to your transfer station on your premises. Alternatively, we are happy to find a suitable location for the storage system.
Yes. We make use of available capacity at your substation and share investment costs by agreement, ensuring optimal utilization and reduced operating expenses.
It typically takes around 1.5 years, depending on the location, permitting timeline, and component availability. The technical lifetime of the system is between 15-30 years.